Latest Road Works Bulletin

Friday 11 May 2012

Emergency repairs to the Great North Road N6

Due to a burst main on the Great North Road N6 Thames Water are carrying out repairs at its junction with Woodside Avenue N6. These works involve the use of temporary traffic signals and a closure of Woodside Avenue at this junction. These works are expected to be completed by Wednesday 16 May.

Wednesday 11 April 2012

Emergency repairs affecting Wightman Road N8

Due to a collapsed Thames Water sewer, Wightman Road N8 will be closed at its junction with Hampden Road N8. The road closure will be put in place this evening and the works are expected to be complete by Monday 16 April. Diversion routes will be put in place but traffic delays are expected.

Wednesday 28 March 2012

Emergency repairs affecting Palace Gates Road N22

National Grid Gas are working in Palace Gates Raod N22 o/s 65. These works are to repair a gas leak and require the use of temporary traffic signals. These works are scheduled to be cleared by Friday 30 March 2012. Due to signals already being in place on Bedford Road N22 for the purpose of Thames Water repairing a sewer, delays are expected at this location. The works on Bedford Road N22 are also due to finish by Friday 30 March 2012.

Tuesday 27 March 2012

Emergency repairs affecting High Road N22

Thames Water are working in High Road N22 at the junction with Brampton Park Road to effect repairs to an inspection cover in the carriageway. The cover has collapsed and is requiring extensive repairs. These works are requiring the use of temporary traffic signals, and are expecting to last 3 to 4 days, with the works hopefully being cleared by the end of Friday 30 March 2012. Severe delays are expected at this location for the duration.

Thames Water Victorian Mains Replacement (VMR) works

Currently ongoing in Westbury Avenue N22, and during the Easter school holidays the works will require Westbury Avenue to be closed from the High Road going east for the duration of the holiday. The diversion route will be along High Rd N22 and onto Lordship Lane N22 for northbound traffic and along Green Lanes N8, West Green Road N15, Belmont Road N15, Downhills Way N17 and onto Lordship Lane for southbound traffic. This should be in place between 31 March 2012 and 15 April 2012.

Wednesday 4 January 2012

Tottenham Hotspur Football Club matchday traffic management

Subsequent to discussions with the Metropolitan Police Service, London Transport Buses, Tottenham Hotspurs Football Club and Haringey Council from the 11 January 2012 there will be a change to the management of traffic before and after Tottenham Hotspurs matches.

CSP Ltd, who undertake the current traffic arrangements will be implementing the following additional actions to reduce traffic congestion.

Watermead Way junction with Leeside Road

Northbound traffic in Watermead Way will be held on every other green traffic light phase to allow additional capacity for vehicles exiting Leeside Road.

High Road N17 at junction White Hart Lane

Southbound traffic in High Road N17 turning left into White Hart Lane will be controlled by Traffic Marshals to prevent northbound traffic in High Road N17 being obstructed.

To see a plan of this traffic management, please go to the attached files section below.

|Back to top

Tuesday 4 October 2011

A406 / Green Lanes Carriageway Resurfacing Works - Update

As part of Transport for London’s A406 improvement works, the central section of the A406/Green Lanes junction will be closed from the evening of 7th October 2011 at 20:00 to the morning of 10th October at 05:00 to facilitate the resurfacing of the junction. The works will prohibit North and South bound traffic movement across the junction over the weekend period.

To see a map of the local diversionary routes, please go to the attached files section below.

Traffic management

During the closure there will be fully signed diversion routes in place. Traffic will be maintained on the A406 on both East and West bound carriageways. Right turn movements from the A406 into Green Lanes from both East and West bound directions will be prohibited during the duration of the works.

A pedestrian route across the A406 junction between North and South Green Lanes will be maintained throughout the entire period.

Please note: The junction at Powys Lane and the A406 Bowes Road has now been re-opened to all traffic.

Skanska Infrastructure Services apologise in advance for any inconvenience that may be caused as a result of these works. Should you require further information or an update during the delivery of these works please contact their UK-based Customer Care Team on 0800 066 5006 between 8am and 5pm Monday to Friday. Outside of these times, an automated service is available with options to either leave a message of speak to their Out of Hours Team.

|Back to top

Tuesday 11 January 2011

A406 Works Update

There will be a road closure of the A406 east bound and west bound on 16 January 2011 between 12.01am and 5am from Green Lanes to Pinkham Way to remove the pedestrian foot bridge. Signed diversion routes will be in place throughout. For more details please go to the Bounds Green page on the Transport for London website (external link).

Bus routes affected

Due to the ongoing works on the A406 North Circular Road, traffic delays on Green Lanes have been affecting bus routes 121, 232, 141 and 329. Route 141 crosses the junction of Green Lanes and the A406 and has been particularly affected with delays of up to 30 minutes. To ensure a regular service between Wood Green Station and London Bridge, and to protect the service from significant delays across the entire route, the 141 will run between Wood Green Station and London Bridge only from January 2011. This will be until the works finish (approximately one year).

Routes 121, 232, 329 and N29 provide an alternative service north of Wood Green Station to Palmers Green. Routes 329 and 232 will have additional resources to maintain reliability (this has already been provided on route 232 as it goes along the section of the A406 directly affected by works).

|Back to top

Thursday 18 November 2010

Temporary Closure of A406 – Installation of new footbridge

As part of TfL's Bounds Green Improvement Scheme, the A406 will be closed between the junctions of Bounds Green Road/Station Road and Brownlow Road/Powys Lane on Sunday 21 November 2010 for the installation of a new footbridge.

The new footbridge is currently being assembled within the confines of existing security fencing on Bowes Road N11, behind properties 13-43 Elmdate Road. In order to safely accommodate the installation of the new footbridge and due to the level of traffic that uses the A406 during the day, the works will take place at night during the hours of 12.30am to 5am.

To see the diversionary route, please go to the attached files section below.

Traffic Management:

Clearly marked signs will be put in place along the A406 to notify drivers that there will be no access to the A406 between Bounds Green Road/Station Road and Brownlow Road/Powys Lane junctions from 12.30am to 5am.

All Heavy Goods Vehicle (HGV’s) travelling eastbound on the A406 will be diverted north onto the A1, along the M25 and south onto the A10 to allow access back on to the A406. Westbound HGV’s will be diverted north onto the A10, onto the M25 and south onto the A1/A41 to allow access back on to the A406.

From 10pm on 20 November, the A406 junctions with Natal Road, Warwick Road,Highworth Road and Stanley Road will be closed off to prepare for the installation and provide a safe area for workers to operate. Clearly marked diversion signs will be in place.

Local access will be possible to and from Hastings Road, Bexhill Road, Pevensey Avenue, Milton Grove, Chaucer Close, and Shakespeare Avenue and traffic marshals will be in place to direct traffic. Access to these roads will only be possible via the Bounds Green Road/Station Road junction. No access will be provided from Bowes Road.

Full access to the A406 in this location will be reinstated and traffic management measures will be removed at 5am on 21 November. Safe pedestrian routes will be provided at all times during the works with pedestrian diversion routes provided where necessary.

Skanska Infrastructure Services apologise in advance for any inconvenience that may be caused as a result of these works. Should you require further information or an update during the delivery of these works please contact their UK-based Customer Care Team on 0800 066 5006 between 8am and 5pm Monday to Friday. Outside of these times, an automated service is available with options to either leave a message or speak to their Out of Hours Team.

The Bounds Green improvement scheme’s web pages (external link) have recently been updated to launch artist’s impressions of the final scheme.

|Back to top

Thursday 19 August 2010

A406 Works – Update

Traffic on the Haringey connected section of the north circular A406 will be disrupted over the next six months as TfL carry out road improvement works.

Preparatory works have started at several locations along the length of the scheme to clear land and divert utilities, including between Green Lanes and Palmerston Crescent. Work has also begun on building a new carriageway for the A406.

Generally, the area between the Colney Hatch Lane turn off and Green Lanes will be the worst hit immediately by delays as several different works take place between the two points. Signage will be in place to warn of diversions.

Bowes Road and Palmerston Road

From Monday 16 August to 28 August works will require traffic management measures on the A406 Bowes Road which will temporarily close the junction of Palmerston Road/A406 Bowes Road.

Bowes Road and Green Lanes (northbound)

From the end of August work will begin on the footway and road at the junction of the A406 Bowes Road and Green Lanes.

The carriageway will be widened to three lanes and the works will continue until May 2011. The first phase will involve a banning of the left turn from the A406 into Green Lanes (northbound) for around three months.

For more information and details of diversions and other works visit the Bounds Green page on the Transport for London website (external link) or call 0800 066 5006 between 8am and 5pm.

|Back to top

RSS feeds

You can also subscribe to the roads works bulletin using the following link:

RSS feed icon RSS road works bulletin | What is RSS?

İlişik Dosyalar