Core Strategy

A New Plan for Haringey 2011-2026

Core Strategy Preferred Options Consultation has now closed

Thank you to those who participated in the consultation and submitted representations.  The Planning Policy Team are currently analysing all comments received and summaries of these will be available to view end August 2009.

The Preferred Options public consultation, May and June 2009, was the second stage in the development of Haringey’s Core Strategy, following the Issues and Options consultation which took place in early 2008.

The Core Strategy is the key strategic guidance in Haringey’s Local Development Framework. This is replacing the Unitary Development Plan (UDP) as the overarching planning guide for the borough

The consultation documents below set out 12 policy proposals on how the borough will manage issues of housing, climate change, transport, employment, leisure, retail, open space, and design up until 2026.

We are asking you to give your views and comments on the proposed policies:

  • How will they impact on your neighbourhood/community/street?
  • What suggestions can you make to improve these policies?

Please note that some of the consultation documents are very large in size because of the high quality maps and pictures they contain. These documents may take a few minutes to download. If you have any problems with them please contact the Planning Policy team on 020 8489 1479

We also have a lower quality version of the full consultation document below - the pictures and maps may not be as easy to read as the high resolution version but it will be quicker to download.

High quality versions

FilenameFile TypeSize
A New Plan for Haringey 2011-2026 - Core Strategy Preferred Options

PDF

24MB

The above document has been broken down into smaller sections below:
Introduction

PDF

6MB

Part 1 - People at the Heart of Change in Haringey

PDF

7MB

Part 2 - A Greener and Sustainable Future

PDF

5MB

Part 3 - Economic Vitality and Prosperity Shared by All

PDF

4MB

Part 4 - A Safer, Attractive and Valued Urban Environment

PDF

238KB

Part 5 - Healthier People with a Better Quality of Life

PDF

2MB

Monitoring and Implementation

PDF

79KB

Core Strategy References

PDF

81KB

Appendix 1 - Draft Infrastructure Priority List

PDF

79KB

Lower quality version

FilenameFile TypeSize
A New Plan for Haringey 2011 - 2026 - Core Strategy Preferred Options (lower quality version)PDF3MB

Responses to the Preferred Options consultation will be analysed and all comments will be available for you to view on our planning policy consultation portal. Please follow this link to the Planning Policy Consultation Portal.

|back to top

A copy of the Core Strategy Issues and Options is available to download in the attached files section below, although the consultation period, which ran from the 8 February to 31 March 2008, has now ended.

In addition, a sustainability appraisal report has been produced which assesses the preferred policies against the sustainability objectives. The sustainability appraisal report can also be found in the attached files section below.

  • Please note that some of the attachments are between 2 – 4MB in size and may take a few minutes to download.
|back to top

We have a database of individuals and groups who we keep informed on the details of consultation for the Core Strategy. If you would like to be on that database please email us at ldf@haringey.gov.uk

Details of this consultation are also available on the Council’s Consultation Calendar.

If you would like more information on the Core Strategy and consultation outcomes please contact the Planning Policy Team:

Address: 639 High Road
             Tottenham
             London
             N17 8BD

email ldf@haringey.gov.uk

Telephone 020 8489 1479

|back to top

Evidence Base

As part of the work to develop our Preferred Options document, we have commissioned various studies. These include a 2008 retail and town centres study, a Sustainability Appraisal report, and housing trajectory. Drafts of the flood assessment for housing trajectory sites and an Equalities Impact Assessment are also available to download below.

The North London Waste Plan (NLWP) Strategic Flood Risk Assessment is being used as the baseline for the Haringey Strategic Flood Risk Assessment. This is available on the NLWP website (see the external links section below).

If you require any further information on the Core Strategy, please call the Planning Policy team on 020 8489 1479.

Attached files

FilenameFile TypeSize
core strategy sustainability appraisal draft-may 09.pdfPDF2099KB
equalities impact assessment draft preferred options.pdfPDF490KB
strategic flood risk assessment-potential housing sites final.pdfPDF32KB
core strategy sustainability appraisal scoping report dec 2007.pdfPDF3714KB
core strategy issues and options report.pdfPDF2438KB
core strategy - feedback from consultation.pdfPDF25KB
retail study dec 2008.pdfPDF874KB
retail study appendices dec 2008.pdfPDF1757KB
Core Strategy - Summary of Issues and Options Consultation Responses.pdfPDF104KB
Haringey Employment Study 2009.pdfPDF608KB
Draft Core Strategy Monitoring Framework.pdfPDF457KB
|back to top

The following links are not part of the Haringey Council website. Please read our legal disclaimer before using these links

|
Your feedback on this webpage

Was this information useful?



If you want to give comments on the service itself please visit our Contact page.


 

Page Last Updated: 11 December 2009

This page belongs to the following categories :
- Environment > Planning
- Environment > Planning > Sites and projects policies

 
|
three children smiling

Did you know?

Over 3,000 childcare places are available for young children