Building Control Inspections
What is inspected on site?
Inspection of the work on site will be to ensure compliance with the Building Regulations.
The following aspects of the work may be examined:
- foundation excavations
- completed foundations
- fire protection
- drainage systems
- damp proof courses and membrane
- brickwork and blockwork for walls
- thermal insulation to walls floors and roofs
- structural elements
- weather proofing
- flues and vents to appliances
- ventilation
- staircases, landings and galleries
- safety glazing
- facilities for disabled people
- sound proofing
Inspections will also be used to check:
- suitable materials are used
- work covered by the Building Regulations is carried out to a reasonable standard
If necessary use of other professional expertise and testing procedures may be required.
Contact us to find out how to request a site inspection, and which inspections require advanced notice.
Address
Building Control
Planning Policy and Development
Urban Environment
639 High Road
N17 8BD
Tel: 020 8489 5504
Fax: 020 8489 5229
Email: building.control@haringey.gov.uk
Useful External Links
The following links are not part of the Haringey Council website. Please read our legal disclaimer before using these links
- Local Authority Building Control (National Organisation)
- Department of Communities and Local Government
- London District Surveyors Association
- Health and Safety Executive
- Considerate Contractors
Page Last Updated: 18 November 2008
This page belongs to the following categories :
- Environment > Planning




