Building Control Inspections

What is inspected on site?

Inspection of the work on site will be to ensure compliance with the Building Regulations.

The following aspects of the work may be examined:

  • foundation excavations
  • completed foundations
  • fire protection
  • drainage systems
  • damp proof courses and membrane
  • brickwork and blockwork for walls
  • thermal insulation to walls floors and roofs
  • structural elements
  • weather proofing
  • flues and vents to appliances
  • ventilation
  • staircases, landings and galleries
  • safety glazing
  • facilities for disabled people
  • sound proofing

Inspections will also be used to check:

  • suitable materials are used
  • work covered by the Building Regulations is carried out to a reasonable standard

If necessary use of other professional expertise and testing procedures may be required.

Contact us to find out how to request a site inspection, and which inspections require advanced notice.

Address
Building Control
Planning Policy and Development
Urban Environment
639 High Road
N17 8BD

Tel: 020 8489 5504
Fax: 020 8489 5229
Email: building.control@haringey.gov.uk

The following links are not part of the Haringey Council website. Please read our legal disclaimer before using these links

|
 

Page Last Updated: 18 November 2008

This page belongs to the following categories :
- Environment > Planning

 
|
warden with abandoned vehicle

Did you know?

Dave Clark 5's first gig was at South Grove Youth Club, South Tottenham