Alexandra Park BSF

- Building Schools for the Future (BSF) at Alexandra Park
- Making a real diference
- Making it Happen
- Environmental Information
- Further information
Building Schools for the Future (BSF) at Alexandra Park
This £3.8 million project was completed in Summer 2010. Today students and staff are now enjoying facilities created as part of Building Schools for the Future (BSF).
|back to topMaking a real difference

The new facilities at Alexandra Park School are enabling new ways of teaching and learning, and feature:
- a new sixth form centre with a teaching training base
- remodelled Science block with new facilities
- infill of the atrium creating new classrooms and teaching spaces
- a new Student Support Centre for students with Special Educational Needs (SEN) with space dedicated to students with Behavioural, Emotional and Social Difficulties (BESD)
- a new Multi-Use Games Area (MUGA) for use by the school and the local community
- new cabling, server rooms and floor distributors to improve the ICT.
You can read a case study on post 16 education at Alexandra Park School in the attached files section.
|back to top
Making it Happen
The scheme was granted planning permission in February 2009
Construction work began in May 2009
The science block and SEN area were being used for teaching and learning in Spring 2010.
The Architect for this project was TP Bennett.
The Contractor was Balfour Beatty. Find out more in Meet the Contractors.
|back to top
Environmental Information
The project at Alexandra Park school aims to achieve an independent environmental rating (BREEAM) of 'Very Good'. In addition, the school will work closely with Capel Manor College to offer a National Diploma in Land Management; educating students about biodiversity and working in harmony with nature. The school features planting to reflect its biodiversity education.
|back to topFurther information

Building Schools for the Future
Civic Centre
High Road
Wood Green
N22 8LE
Tel 020 8489 4581
Fax 020 8489 2886
Email bsf@haringey.gov.uk.
|back to topAttached Files
| Filename | Filetype | Size |
|---|---|---|
| case study - post 16 education.pdf | 64 KB | |
| PDF documents require Adobe Acrobat reader. Please click here to download. | ||
Useful External Links
The following links are not part of the Haringey Council website. Please read our legal disclaimer before using these links





