BSF and Your School

Schools to benefit from BSF investment

Wave 2

Wave 4

|back to top

BSF will lead to exciting building designs, state-of-the-art technology and flexible space for school and community use; all of which will truly inspire learning. The Children and Young People's Service with governors, headteachers, schools’ staff and other stakeholders are working with advisors to examine how our schools should look and function into the 21st Century.

In 2005 we assessed the quality of buildings at our secondary schools for their suitability and their potential to accommodate the transformation required to achieve our vision. This, added to an assessment of the greatest educational need, was used to create a formula that determined how the BSF investment would be allocated across Haringey.

smiling pupilsThe level of allocation, along with the schools’ own visions, is informing plans for the future of each school site. BSF will lead to exciting building designs, state-of-the-art technology and flexible space for school and community use; all of which will truly inspire learning.

The first school to open was a brand new Sixth Form Centre, which opened its doors in September 2007 (see External Links section below for the Sixth Form Centre website). All other schools will have phased work that will run from early 2008 to late 2011, with the new school in the Heartlands opening in September 2010.

All secondary schools will start to see immediate improvements under BSF through the enhancement of their ICT facilities, which will commence during the school year 2007/8

|back to top

Further Information

Artists building schools for the future impression

Building Schools for the Future
Civic Centre
High Road
Wood Green
N22 8LE

Tel 020 8489 4581
Fax 020 8489 2886

Email bsf@haringey.gov.uk.

|back to top
Attached Files
FilenameFiletypeSize
bsf frequent asked questions.pdf Adobe PDF DocumentPDF125K
bsf glossary of terms.pdf Adobe PDF DocumentPDF119K
Family Guide to School Admissions.pdf Adobe PDF DocumentPDF1208K
PDF documents require Adobe Acrobat reader. Please click here to download.

The following links are not part of the Haringey Council website. Please read our legal disclaimer before using these links

|
 

Page Last Updated: 25 July 2008

This page belongs to the following categories :
- Education and learning > Schools and colleges > Consultations on education

 
|
Inside a new school

Did you know?

We have removed 60,000 square metres of graffiti - the equivalent of more than 12 football pitches